Description

A complete plant to treat municipal waste with recycling of material and eco valorization 

WASTE IS A RESOUCE !!
                FOR THE EARTH
                       FOR ENVIRONMENT

                               FOR THE CITIZENS OF TOMORROW


The Resources of the Future

FULL-CYCLE PLANT FOR CONVERSION OF WASTE AT WORK AND FINANCIAL RESOURCE
 
COMPLETE PLANT FOR THE CONVERSION OF MUNICIPAL SOLID WASTE AND SIMILARs
 

Summary of proposal 

The production plant can be defined type EXTRACTIVE ADVANCED. 
Unlike mines, where you get the raw material that must be worked in steel mills for raw material used, this process draws on existing work and pray, that can be used immediately in other production processes. 
In energy terms, the mining operation will take less than 1% of that required by the mines, the technology required is low and is already available, while the use of labor is significant, as for the mines. 
The matter already worked extracted from the first phase, will require less than 10% of energy to be inserted in production cycles, compared to the raw material obtained through the cycles of refining and processing of steel a settlement. Even for this processing technology to be used is minimal and can easily be implemented using a full soft technologies and alternatives, while the use of induced labor can be very significant. 
In terms of products produced, compared to the mines that you can almost always be considered single-product, this activity allows for a variety of valuable raw material, besides being able to obtain energy that can cover the needs of the settlement, even with a surplus can be used for other purposes.

In terms of employment can be estimated the following reports:
 
A)    3 job for every 2 Tons/day of  MSW to treat.
 
Just for example: A system for treating MSW of 10,000 inhabitants occupy at least 30 workers. 


The manpower to be employed in the mining stage can be not skilled workers without any qualifications. 
In related primary requires a minimum of manual dexterity and craftsmanship. 
Several requests are only secondary in related qualifications, however, from that of a good craftsman to rise.


The initial investment required to build the facility, except for any infrastructure to achieve and the possible cost of the soil.

To better quantify all the costs it need to know the reality of the country in which you want to accomplish, so thorough an examination can be done only after getting the necessary information.